11
IF YOU ARE USING MORE THAN ONE EMITTER:
Step 1: Determine the length of coaxial cable needed to reach between the emitters. 100 feet (30 m)
of coaxial cable is included with each emitter. You will need to cut it to length.
Additional RG–58 coax can be added. Make sure you leave some slack at each end.
Step 2: Install BNC connectors on each end of the cable. (See instructions on page 12.)
Step 3: Connect the baseband cable from the Baseband Out Jack on the first emitter in the chain
to the Baseband In jack on the next TX8 Emitter in the chain. Use the cable clamps and
screws provided to secure the cable. The coax can also be routed through conduit before
attaching BNC connectors. You can chain as many emitters together as you need.
Remember that each emitter needs its own TFP 010 power supply.
Kommentare zu diesen Handbüchern